DHM GROUP has successfully completed hot commissioning and launched the equipment for Korea Zinc, delivering its first project in South Korea. At the client’s site, a full scope of preparatory activities was carried out jointly with the customer’s specialists: precise parameter tuning was performed, system readiness was ensured, personnel training was conducted, and the acceptance certificates were signed following commissioning.
Contracts for the supply of two sets of stationary taphole drilling and mud gun machines, equipped with a modern control system and a hydraulic power pack for two furnaces, were signed in the first half of 2025. The project marked an important step in expanding DHM GROUP’s geographic footprint and confirmed the demand for our engineering solutions in new markets.
The hot commissioning demonstrated reliable and stable performance of the equipment under real operating conditions. Close coordination between the teams on both sides ensured a confident start-up and a smooth transition to industrial operation.
