DHM GROUP has commenced the implementation of a new project for Kamet-Steel, which includes the supply of a modern equipment package for blast furnace taphole drilling and mud gun machines. The scope of supply also covers a hydraulic power pack and all necessary auxiliary equipment.
The project is aimed at improving the efficiency of blast furnace operations and ensuring the stability of technological processes. The proposed technical solutions are tailored to the specifics of the existing production setup and are designed to enhance equipment reliability while optimizing maintenance processes.
The cooperation between DHM GROUP and Kamet-Steel spans nearly 20 years, with the first equipment package delivered in 2007. Since then, several projects have been successfully implemented, contributing to the development and modernization of the plant’s production facilities.
Today, despite the challenging environment, metallurgical enterprises in Ukraine continue operating and investing in equipment upgrades. This project reflects the ongoing development of production infrastructure and the integration of modern engineering solutions.
The project will be executed in full compliance with the client’s technical requirements and current operating conditions. The scope includes manufacturing, delivery, and comprehensive technical support during the commissioning phase.